Skip to main content

Small but Clever: Micro.

Micro is just as high performance as it is flexible. What makes it special is that you can inject and then withdraw your natural gas within just one week. Micro lets you make a Trading product even more flexible but these small yet powerful packages are also a quick and clever solution when booked individually. Micro can also be booked at the Etzel and Jemgum facility making it available for use with THE and TTF market areas.

Due to Beate-regulation, which came into force on 01/01/2016, VNG Gasspeicher GmbH offers an account model for their storage Etzel. This enables both the discounted storage access, while using only one market area, as well as the market area crossing, this however, eliminates the grant of the discount on the transportation fee. In addition, a transfer between accounts is possible, but this falls to a rebooking fee. Thus you can continue to respond flexibly to market conditions.

 

Configure in easystore

 

Market area

THE | TTF

Storage

VGS Storage Hub, Etzel, Jemgum

Turnover duration

7 Days

Characteristic curve restriction

no

Minimum level

no

Interruptibility

interruptible

Minimum booking amount

no

Transport

Booking and nomination by storage customer

Lead time for renomination

2.0 h

Implementation period

Non binding formless request:

Two (2) working days

Non binding booking request:

Two (2) working days

Online booking:

Three (3) hours

Transfer of ownership

no

Physical storage

yes

Transfer points   
StorageMarket areaAdjacent network operatorGas transfer point
VGS Storage HubTHEONTRAS Gastransport GmbHVGS Storage Hub
EtzelTHE
 
Gasunie Deutschland Transport Services GmbHUGS Etzel-ESE
Open Grid Germany GmbHEtzel (Speicher ESE), Bitzenlander Weg 3, Speicher
Jemgum

THE

 

​TTF
 

Gascade Gastransport GmbHJemgum I
Gasunie Transport Services B.V.Oude Statenzijl
(astora Jemgum)

 

 Working gas volume

GWh

 

interruptible

0.50

 Injection rate

MWh/h

 

interruptible

5.00

 Withdrawal rate

MWh/h

 

interruptible

10.00

 Injection duration

Days

 

 

 

4.17

 Withdrawal duration

Days

 

 

 

2.08

 Turnover duration

Days

 

 

 

6.25

Contract term

 

 

 

 

 

 Start 

 

Possible for each gas day

 Duration 

 

7 consecutive gas days or a multiple of it

Additional services 

 

 

 

 
 Gas transfer

On request (charges as per fee schedule; free of charge for connection contracts)

 (Partial) capacity transfer

 

 

no

     

Documents

 
Sample Contract Micro

Link

GTC

Link

Operating Manual (Flange)

Link

Fee schedule

Link

Do you have questions or  
need help deciding?

 

Free Capacities   Contact us   Configure your Product

Small, Clever & Bio: BioMicro.

BioMicro has all the advantages of Micro - but is designed for the storage of bio natural gas. We guarantee that the biogenic properties remain unchanged: We keep a separate account especially for you.

 

Configure in easystore

 

Market area

THE

Storage

VGS Storage Hub

Turnover duration

7 Days

Characteristic curve restriction

no

Minimum level

no

Interruptibility

interruptible

Minimum booking amount

no

Transport

Booking and nomination by storage customer

Lead time for renomination

2.0 h (Within-Day)

Implementation period
(Single booking with contract conclusion at the same time)
 

Non binding formless request:

Two (2) working days

Non binding booking request:

Two (2) working days

Online booking:

Three (3) calendar day

Transfer of ownership

no

Physical storage

yes

Transfer point

 

StorageMarket areaAdjacent network operatorGas transfer point
VGS Storage HubTHEONTRAS Gastransport GmbHVGS Storage Hub
 Working gas volume

GWh

 

interruptible

0.50

 Injection rate

MWh/h

 

interruptible

5.00

 Withdrawal rate

MWh/h

 

interruptible

10.00

 Injection duration

Days

 

 

 

4.17

 Withdrawal duration

Days

 

 

 

2.08

 Turnover duration

Days

 

 

 

6.25

Contract term     
 Start 

 

Possible for each gas day

 Duration 

 

7 consecutive gas days or a multiple of it

Additional services 

 

 

 

 
 Gas transfer

On request (charges as per fee schedule; free of charge for
connection contracts)

 (Partial) capacity transfer

 

 

no

Documents

 
Sample contract BioMicro

Link

GTC

Link

Operating Manual (Flange)

Link

Fee schedule

Link

Do you have questions or  
need help deciding?

 

Free Capacities   Contact us   Configure your Product